Title of Activity
-Continue on doing the methodology (MPLAB IDE v8.30, Source Code, C Language)
-Budget estimation for the project.-Continue on doing the methodology (MPLAB IDE v8.30, Source Code, C Language)
Objective
- To know what method being used in this project for example cooding use in (MPLAB IDE v8.30, Source Code, C Language)
- To do an estimation on the budget for the project.
Content/Procedure
MPLAB
IDE v8.30
Source Code
C Language
Result/Analysis
MPLAB
IDE v8.30
·
MPLAB IDE runs
as a 32-bit application on MS Windows®, is easy to use and includes
a host of free software components for fast application development and
super-charged debugging.
·
MPLAB IDE also
serves as a single, unified
graphical user interface for additional Microchip and third party software and
hardware development tools.
Source Code
·
used as a method of communicating algorithms between people (e.g., code snippets in books). Such a language is specially designed to facilitate the
work of computer programmers, who
specify the actions to be performed by a computer mostly by writing source
code, which can then be automatically translated to binary machine code that the computer can directly read
and execute.
·
Most computer applications are distributed in a form that
includes executable files, but not their source code, which is only useful to a computer programmer who wishes to understand or modify the
program.
C Language
·
C is much closer to assembly language than are most other
high-level languages. This closeness to the underlying machine language allows
C programmers to write very efficient code.
·
Programmers around the world embrace C because it gives
maximum control and efficiency to the programmer.
Budget
The
expected cost should be the lead in the entire project making. This is to make
sure that the expenditure for the project does not exceed the budget cost. The
table below show estimated budget on the overall cost of the project.
A) Software
|
||
1.
|
PROTEUS ISIS (Student Demo version)
|
-
|
|
|
|
B) Stationary
|
||
1.
|
Papers
|
RM 30
|
2.
|
Printer ink
|
RM 10
|
3.
|
Photocopy
|
RM 20
|
4.
|
Binding
|
RM 20
|
|
|
|
C) Others
|
||
1.
|
Travelling expenses (Data collection)
|
RM 50
|
2.
|
IR Sensor & Alarm
|
RM 100
|
3.
|
Microcontroller
|
RM100
|
4.
|
LCD
|
RM30
|
5.
|
PCB Board
|
RM20
|
6.
|
Casing
|
RM20
|
7.
|
LED
|
RM20
|
8.
|
Other related
electronic component
|
RM80
|
TOTAL
|
RM 500.00
|
Conclusions
From the
conclusions in week 9
-As conclusion, this is the main important
that needed to do the project is a programming code and the estimation budget for this
project. All of this main item will make the process for this project
will go smooth if anything according to plan.