Tuesday 4 September 2012

FYP 2 (WEEK 5)

WEEK 5


Title of Activity

  • Identify the component


Objective

  • To identify the the component use for the  PIC circuit
  • Putting the component on PCB board


Content / Procedure

The component are arrange and ready to be solder onto PCB board

Component are soldered onto PCB board





Problem Statement

  • Some component are left out and there is no space on the front of the PCB board .


Solution

  • The left out component are solder at the back of the PCB board and so with the jumper connection between the component.


Conclusion

Although soldering the component at the back of the PCB board is inappropriate, that is the only way to make the circuit function. Otherwise , the circuit will not working properly.

Monday 3 September 2012

FYP 2 (WEEK4)

WEEK 4


Title of Activity

  • Continue the activity from WEEK 3


Objective

  • To continue work from week 3
  • To design the layouts for Printed Circuit Board (PCB) using Ultiboard


Content / Procedure

The front layout of the PCB


The back layout of PCB

Problem statement

  • The arrangement is a little bit unorganized. Some of the component is too big and it is hard to allocate them on board.


Solution

  • Minimize the component and the space by arranging it auto-arranging in the software.
  • The track of the circuit is make sure by measurement so the current can flow smoothly without having a short circuit.


Conclusion

As a conclusion, designing a circuit is not easy especially when it have to be transfer to printed board. The connection and the arrangement of the component is important so that the circuit is neat and function well.

FYP 2 (WEEK3)

WEEK 3


Title of Activity

  • Design the PIC circuit for the project using Multisim


Objective

  • To make sure the connection are functioning well.


Content / Procedure

  • The schematic layout for PIC 16F877A


Circuit Diagram for PIC 16F877A for the project


Problem Statement

  • Combination and parts of relay can't function properly because the supply for the relay using 12V DC which is not the same with the circuit.


Solution

  • Design a separate power supply to activate the relays in PIC circuit.


Conclusion

The schematic design is finalized so it can be compatible with other device. It is hard to design it because I have to really make sure it can function properly based on combination of three circuit.

Sunday 2 September 2012

FYP 2 (WEEK2)

WEEK 2

Title of Activity
-Preparing and doing some modification for sensor


Objective
-To identify the suitable sensor for this project



Mercury Sensor Switch


Mercury Sensor Switch Casing

Block Flow of Project


Problem Statement
  • Using IR sensor is quite dangerous to human eyes because the percentage to get blind is 80% from the research that have been made.
  • IR sensor cant detect the eye movement accurately. Human eyes are different from each other and this will make it is more hard to measure precisely.


Solution for Problem Statement

  • The alternative is to change to IR sensor to mercury sensor switch.
  • Using mercury sensor, it will detect the posture(head movement) of human body while driving. 


Result and Analysis
  • Mercury sensor allow or interrupt the flow of electric current in an electrical circuit in a manner that is dependent on the switch's physical position or alignment relative to the direction of the "pull" of earth's gravity, or other inertia.
  • It was noticed that  the sensor responds quite quickly to changes of the mercury concentration  in  air. 


Conclusion

From the research,a few solution have been identified.The sensitivity of the drop to gravity provides a unique sensing function, and lends itself to simple, low-force mechanisms for manual or automatic operation. The sensor are quiet as there are no contacts that abruptly snap together. The mass of the moving mercury drop can provide an "over center" effect to avoid chattering as the switch is tilted. Multiple contacts can be included in the envelope for two or more circuits.


References


  1. Vibrator Sensor
  2. Mercury Switch Sensor


FYP 2 (WEEK 1)

WEEK 1


Title of Activity
  • Introduction Final Year Project II Briefing.
  • Continue from FYP I progress
  • Change title of the project

Objective
  • The briefing is about the agenda in FYP 2.
  • Need write all work on blog week 1 to week 14

Content/Procedure
  • A short briefing about FYP for FYP 1 and FYP 2.
  • All work and research need write on the blog and make it weekly writing.
  • Presentation week for the FYP 1 is week 12 while for the FYP 2 is week 14.
  • Block flow of project

Block Flow of project



Result/Analysis

  • Continue some research in FYP2
  • All preparation must be done before week 14.

Conclusions

What we can conclude here is in week 1,overall progress should be updated in the blog so that every single detail or progress can be monitoring by the adviser.It is an alternative if we can not meet with the adviser.